Siemens Healthcare Case Study

The results :

  • Decreased Defects and Faster Defect Resolution 
  • Decreased Lead Time – Under its pure Scrum framework, the Siemens development team’s lead times varied considerably
  • Increased Throughput – Improved lead time resulted in an increase in throughput (or story completion rate). The Siemens team was able to reduce median lead time by 21.05%(resulting in a 33% increase in throughput). This occurred with no changes in story size or team composition.

Download the Case Study and find out how the Siemens team achieved all this applying Scrumban to their current workflow.